Associated with this project, SaskPower is responsible for the procurement and delivery to the Site of the following equipment:
- Three Hitachi H25 Gas Turbines (GTG) complete with Generators, and Static Excitation;
- Two 138-13.8 KV step-up transformers (GSUT);
- Six Once through Steam Generators (OTSG);
- One 95MW to 105MW induction condensing steam turbine (STG) complete with generator, static exciter system, control system, gland seal system, oil conditioning system and instrumentation.
The Engineer will be required to review and provide comments to drawings, manuals and project related documents received from the above SaskPower Equipment suppliers to coordinate interface design. The Engineer will be responsible for the design of all interfaces required to integrate the Balance of Plant (BOP) Equipment with the SaskPower Equipment. The Engineer will be responsible for the performance of all designs and equipment selected to meet the interface conditions provided by the SaskPower Equipment suppliers.
The Engineer will be responsible for the sizing, specification preparation, tendering, bid evaluation, recommendation for purchase, quality control, delivery and warranty of the BOP Equipment (“Engineer Supplied Equipment”). This service will include the provision of OEM technical advisors (TA) to interface with SaskPower’s Works Contractors during installation and the Engineer’s commissioning team during commissioning.
The RFP closes September 28, 2012.